Our premium Builders’ Trestle Board Stand is engineered for strength, stability, and reliable performance across all types of construction and maintenance work. Built from heavy-duty steel with adjustable height and levelling feet, it provides a secure and adaptable platform on any jobsite. An integrated tool tray keeps essential equipment within easy reach, delivering improved efficiency and convenience throughout the workday.
SKU
216672,216586,216587,216673,216588,216591,216593
Dimensions
100 (L) x 60 (W) x 100-180 (H) cm
Weight
8kg
Materials
Steel Frame, Plastic Feet
GPSR Information
UK
Manufacturer:
Monster Group UK Limited, Monster House
19-23 Alan Farnaby Way,
Industrial Estate Sheriff Hutton,
York
YO60 6PG
Person Responsible:
Rana Harvey, Monster Group UK Limited,
Monster House
19-23 Alan Farnaby Way,
Industrial Estate Sheriff Hutton,
York
YO60 6PG,
England,
+441347878880
EU
Manufacturer:
Monster Group BV,
Van Heemskerckweg 28A & B,
Venlo 5928LL
Netherlands
+441347878880
Person Responsible:
Rana Harvey,
Monster Group BV,
Van Heemskerckweg 28A & B,
Venlo 5928LL,
Netherlands,
+44134787888
Materials
1
Top Bar
1
2
Vertical bar with stand
2
3
Side Extension Bar
2
4
Central Bar
2
5
Foot
4
6
Screw M6x40
14
7
Washer 06
14
8
Nut M6
14
9
Tool Tray
1
10
Locking Screw
2
11
Hook
6
12
Chain Locking device
2
13
Screw M5x45
4
14
Nut M5
4
Assembly
1. Prep the two side frames
Put the two support leg frames (2) on the floor, parallel to each other, with the open tops facing upward (where the top bar will sit).
2. Install the vertical bars
Insert the two vertical straight bars (3) into the upper sockets/holders on the support leg frames (2) (one vertical bar per side frame).
Secure each vertical bar (3) to its support leg frame (2) using the Locking Screw (10) and Locking Device (12) in the holes shown for that joint.
3. Connect the side frames with the bottom bar
Fit the bottom horizontal straight bar (4) between the two side frames (2), aligning the holes.
Bolt it in place using M6×40 screws (6) with washers (7) and M6 nuts (8) at each end.
4. Fit the top bar
Place the top bar (1) across the tops of the two vertical bars (3).
Secure the top bar (1) to each vertical bar (3) using M6×40 screws (6) + washers (7) + M6 nuts (8).
5. Install the tool rack and hook
Attach the tool rack (9) in the position shown.
Fix it using the indicated M6 hardware (6, 7, 8).
Attach the hook (11) to the rack/position shown, using the indicated fastener points.
6. Install the support feet
Screw the support feet (5) onto the bottoms of the support leg frames (2)
Adjust them so the stand sits flat and doesn’t rock.
Maintenance
7.
Inspect regularly: Check the frame, welds, and adjustment mechanisms for signs of wear, cracks, or distortion before each use.
Keep joints and moving parts clean: Remove dirt, dust, and debris from hinges, locking pins, and adjustment points, and lightly oil them to ensure smooth operation.
Protect against corrosion: Wipe down the stand after exposure to moisture and store it in a dry area to prevent rust; apply a rust-inhibiting spray if needed.
Tighten components: Periodically check all bolts, screws, and locking mechanisms to ensure they remain secure and functional.
Store the trestle stands in a dry, sheltered environment to prevent corrosion and damage from weather exposure.
Previous stepCopy link to sharePrint / PDFNext step